Main power supply adjustments – Welch Allyn PROPAQ CS User Manual

Page 52

Advertising
background image

48

Calibration

Welch Allyn Propaq CS Vital Signs Monitor

Main power supply adjustments

The following procedures assume you are continuing from the Recharger Board
calibration. If not, refer to the setup procedures provided at the beginning of this section.

1.

Turn off the monitor.

2.

Remove the metal shield from the Analog Board. (Note the two different screw sizes;
refer to

“Repair procedures”

on page 59 for instructions, if necessary.

Figure 3. Analog PCB measurement and adjustment locations

)correct locations

3.

Connect the DMM reference lead to TP39.

4.

Connect the DMM positive lead to TP29.

5.

Turn on the monitor.

Press any of the lower five buttons to reset the monitor following equipment alerts.

6.

Adjust RP7 to 5.000 ±0.010 V dc.

7.

Refer to the table below and check the dc supply voltages using the DMM.

P5

P6

P7

TP1

U1

U3

TP13

U5

TP5

TP7

TP9

TP15

TP17

RP4

T1

TP3

RP7

TP11

P1

J4

TP29

TP28

RP6

TP39

TP19

TP41

TP47

TP45

PT1

RP2

TP49

TP31

TP23

TP25

U55

TP27

RP5

TP37

TP51

TP43

U109

TP35

P5

PIN 1

PIN 1

P6 PIN 10

Advertising