Welch Allyn PROPAQ CS User Manual

Page 88

Advertising
background image

84

Repair procedures

Welch Allyn Propaq CS Vital Signs Monitor

6.

Lift out the Recharger Board.

When installing the Recharger Board:

blow out any dust and particulates using pressurized de-ionized gas

move all cables out of the way

torque screws to 3.8 in-lb to 4.2 in-lb (0.43 N-m to 0.47 N-m)

Caution As you set the Recharger Board in place during installation, keep the
Board away from the power switch solder terminals to avoid binding against
them. The terminals may become damaged if force is applied against them.

0696 40

Screws

Screws

Advertising