Welch Allyn PROPAQ CS User Manual

Page 92

Advertising
background image

88

Repair procedures

Welch Allyn Propaq CS Vital Signs Monitor

side panel routing

4.

On the new side panel, remove the protective paper from the gasket attached to the
side panel.

5.

Set the side panel in place.

Make sure the side panel completely sets in place (it should be flush with the exterior
of the Rear Chassis). If not properly fitted, the clamp securing the side panel will not
seat.

6.

Apply slight pressure to seal the side panel in the Rear Chassis.

7.

Slide the clamp(s) in place with the detent facing the Chassis plastic so that it presses
against the Chassis.

If the clamp requires excessive pressure to slide in place, remove the clamp and
check the side panel to be sure it is completely seated.

8.

Connect all plumbing and cables.

9.

When installing the right side panel, install a new tie wrap to secure the bead to the
Rear Chassis (see below).

Note

Uncovering the protective paper in the next step exposes the adhesive on the
gasket. Do not touch or otherwise contaminate the adhesive, or the adhesive
may not properly seal the side panel.

Note

When installing the left side panel in the next step, slightly bend up wires at the
P1 and P2 pressure connector pins to allow proper fit.

Caution Do not force the clamp in the next step. Forcing it may damage the
side panel or Rear Chassis.

ROUTE CABLE BUNDLE
ALONG BOTTOM OF
REAR CHASSIS

Advertising