Required tools – Welch Allyn PROPAQ CS User Manual

Page 64

Advertising
background image

60

Repair procedures

Welch Allyn Propaq CS Vital Signs Monitor

Required tools

The following tools are required to disassemble and reassemble the Propaq CS monitor
components.

Note

The DCP PROMs and the Digital Board are not field replaceable due to external
programming requirements. Do not remove the DCP PROMs. For Digital Board
service and/or a DCP software update, contact your Welch Allyn Service
representative.

Caution POSSIBLE DAMAGE FROM STATIC DISCHARGE

All calibration, service, and repair must be done at a static-protected work
station. Failure to protect against damage due to static discharge may reduce
monitor operation life and increase repairs. Place the monitor in an anti-static
area before servicing the monitor.

Table 13. Required tools

Description

Phillips screwdrivers, #1 and #2

Flat blade screwdriver

Adjustable torque screwdriver (2.5in-lb to 7.35in-lb.; .43N-m to .83N-m), with Phillips and
3/16" nut driver heads

Tweezers to help with screw removal and replacement

Static-free mat and wrist band equipment

Wire cutter to remove tie wraps

Tie wrap tool

De-ionized (neutralized), filtered, dry, non-combustible gas under pressure for removing any dust
or debris from the monitor’s interior.

Pliers, standard needle-nosed

Pliers, looping - non-serrated, rounded edges for use on tubing

PROM Remove Tool: Amp Part Number 821903-1

Caution It is recommended you use deionized gas for removing dust and debris
prior to reassembly of monitor components. Commercial devices are available to
neutralize compressed gases.

Advertising