Section 2. installation, Introduction, Basic setup procedure – Xantrex Technology XFR 2800 User Manual

Page 37: Section 2 installation, Section 2, Introduction basic setup procedure, Table 2.1

Advertising
background image

Release 2.1

35

Section 2. Installation

Introduction

This section provides recommendations and procedures for inspecting, installing,
and testing the power supply.

Basic Setup Procedure

See Table 2.1 for a summary of the basic setup procedure and an overall view of the
subsections in Section 2. Use the procedure as a quick reference if you are familiar
with the installation requirements for the power supply. If you want more
information, each step in the procedure refers to subsequent sections which contain
more details. Execute each step in the sequence given.

Table 2.1 Basic Setup Procedure

See Section 3. Local Operation for instructions about front panel operation, OVP,
OTP, shutdown, and using multiple supplies. You will find remote programming and
monitoring described in Section 4. Remote Operation.

Step # Description Action

Reference

1

Inspection

Perform an initial physical
inspection of the supply.

“Inspection, Cleaning, and

Packaging” on page 36

2

Installation

Install the supply (bench or rack
mount), ensuring adequate
ventilation.

“Location, Mounting, and

Ventilation” on page 39

3

Input Power

Connect AC input power.

“AC Input Power” on

page 40

4

Test

Perform functional tests for
voltage mode operation, current
mode operation, and front panel
controls.

“Functional Tests” on

page 43

5

Load

Connect the load.

“Load Connection” on

page 45

6

Sensing

Connect sensing lines.

“Local and Remote

Sensing” on page 53