Autoflow Operation

30

Set Control Switches

MOISTURE CONTROL Switch

On

AERATION FAN Switch

Off

LOAD AUGER Switch

Off

FAN Switch

Off

HEATER Switch

Off

DUMP Switch

Auto

DRY and HOLD Switch

Off

Autoflow Emergency Stop Switch

Out

Actuator Emergency Stop Switch

Out

Fill System Control Box Emergency Stop Switch Out

24 VOLT POWER Switch

On

Control Power Switch

Turn the control power switch on. The

switch will light up. The screen will display a

copyright message and software version number,

total running time in hours and minutes and the

model number, and the serial number and current

time and date. At this time, the controller will lock

out all other dryer functions. Once the date and

time are displayed, press the reset button and the

dryer will perform its safety circuit check. If a

fault is found, an error message will be displayed

on the screen. If all are found safe, the main

drying screen will be displayed.

Drying Chamber

Enter the drying chamber and inspect each

dump hopper for obstructions that may inhibit the

flow of grain into the dump chutes. Make sure that

the gap between the discharge flow plates and the

floor sheets is a minimum of 1-1/2”. All discharge

flow plates should be adjusted evenly around the

bin. Inspect each discharge flow plate and make

sure that the bottom brackets on each flow plate

have not collapsed, due to pressure from walking

around the drying chamber. Inspect the leveling

bands. Make sure that all leveling bands are

installed properly and are in good shape.

Rotary Switches

View the drying chamber switches from

the peak hole on top of the dryer. Make sure that

all three rotary switches are spinning freely.

Double check the seal on each rotary switch top.

The number one cause of switch failure is water.

Make sure when the electricain replaced the top on

the rotary switch that no creases formed in the

gasket. Inspect both the storage and wet supply

rotary switches for operation and proper seal.

Dump Chutes

Enter the storage chamber. Make sure that

all dump chutes are adjusted evenly. When one

chute is level, make sure that all chutes are level.

This is very critical to the correct operation of the

dryer. The center plate, that all the dump chute

chains attach to, should be no greater than 12”

from the pulley when the chutes are level. If the

center plate is further than 12” from the pulley

when the chutes are closed, the chains must be

lengthened.

Linear Actuator

Turn the dump switch on the Autoflow

control box to the “manual open” position. Use a

FILL SYSTEM CONTROL BOX

Advertising