Autoflow Operation

40

The storage chamber high level rotary switch is

located in the storage chamber 3, below the fan

and heater unit(s). The storage chamber high level

rotary switch warns the computer when the storage

chamber is full.

Temperature Hold-Temperature hold is the state

the dryer is in when the dry timer has reached zero

but the grain temperature on the moisture control

thermostat has not reached the grain temperature

setpoint. The dryer will not enter into temperature

hold unless the moisture control thermostat switch

is placed in the “on” position. When the dryer is

in temperature hold “temp hold” will be displayed

on the screen on the dryer control panel.

Unload Delay-The unload delay is used in both

single fill and double fill systems. The unload

delay is located on the dryer control panel next to

the display screen. In single fill systems the

unload delay controls how long fill system #1 runs

TERMINOLOGY/START UP PROCEDURE

after the wet supply tank is emptied. In units with

two fill systems the unload delay controls how

long fill system #1 and fill system #2 run after the

wet supply tank is emptied.

Unload Timer-The unload timer is located on the

dryer control panel below the display screen. It is

a digital timer and controls how long the dump

chutes remain open during the dump cycle. The

setting of the unload timer will be detailed later.

Wet Storage Tank-the wet storage tank tempo-

rarily stores the wet grain that is to be loaded into

the drying chamber and dried. A wet storage tank

can be a hopper tank or a flat bottom bin.

Wet Supply Rotary Switch- The wet supply

rotary switch is located in the wet storage tank.

The wet supply rotary switch warn the computer

when the wet storage tank is empty.

Start Up Procedure

At the beginning of each harvest and before

filling the dryer will grain make sure to inspect the

dryer for rodent damage, and system integrity.

Enter the drying chamber and check each dump

hopper. Remove any obstructions. Test operate

the dryer using the pre-season checklist.

There are two fundamental things to control

with the Autoflow Top Dry (or any dryer); the

drying rate and the grain flow rate, and the drying

air temperature. We consider the best temperature

to be the highest one where the desired grain

quality is maintained. Corn used for live stock

consumption is dried at a maximum recommended

temperature of 200° Fahrenheit. Corn used for

different applications, and other grains may require

lower drying temperatures. By selecting a drying

air temperature a drying rage is established. To

achieve a desired final grain moisture content, the

grain flow rate is adjusted to match the drying rate.

Initial Dryer Start Up

1)

Be sure the control power switch is off.

Turn on the main power supply disconnect

for the Autoflow control box, fan and

heaters, and all fill systems.

2)

Pull out the emergency stop switches on

the Autoflow control box, fill systems

control box, and the actuator control box.

3)

Set the switches on the Autoflow control

box as follows:

Moisture Control switch

On

Aeration Fan switch

Auto

Load Auger switch

Off

Fan switch

Auto

Heater switch

Auto

Dump switch

Auto

Dry and Hold switch

Off

24 Volt Power switch

On