Autoflow Operation

42

START UP PROCEDURE/LAST FILL

Start Up Procedure cont.

21)

After the dump cycle the dryer should

continue to the beginning of the next dry

cycle.

22)

Just before the second dump go into the

drying chamber.

23)

Place your arm in the grain next to the

outside leveling band post.

24)

When the dump cycle begins your arm

should travel from the outside leveling

band post to the bin sidewall. If your arm

does not make it to the sidewall, increase

the time on the unload timer. If your arm

reaches the bin sidewall before the dump

cycle stops, decrease the time on the

unload timer. (This only has to be done

one time).

25)

After the fourth dump stop the dryer.

26)

Enter the storage chamber and gather a

large sample of grain. Gather a good

sample of grain all the way around the bin.

27)

Test the moisture of the sample grain.

28)

If the moisture of the grain is too high

increase the grain temperature setpoint on

the moisture control thermostat five de-

grees for each additional point of moisture

to be removed.

29)

If the moisture of the grain is too low

decrease the grain temperature setpoint on

the moisture control thermostat five de-

grees for each additional point of moisture

to be added.

30)

After the moisture control thermostat is

adjusted, decrease the time on the dry timer

by one-half. The dry timer should not be

set lower than the amount of time it takes

the dryer to refill after the dump cycle.

31)

Restart the dryer. The time on the dry

timer should expire before the grain

reaches the temperature setpoint on the

moisture control thermostat.

32)

Any time a change is made on the moisture

control thermostat the dryer must dump

four times before the full effect of the

change will be made on the moisture of the

grain.

Last Fill

1)

Stop the dryer when all the wet grain has

been loaded into the drying chamber.

2)

Set the time on the dry timer for twice the

recommended amount using the following

charts for the specific bin size, fan and

heater size, drying temperature and grain

input moisture content.

3)

Push the reset button.

4)

Turn the dry and hold switch to the “on”

position.

5)

Turn the load auger switch to the “off”

position.

6)

Press the start switch.

7)

When the dryer shuts down install the fan

inlet cover(s).

8)

Let the aeration fan cool in the top and

store, or manually dump into the storage

chamber.