Sidewall assembly – Grain Systems Tanks PNEG-1912 User Manual
Page 26
Advertising
![background image](/manuals/277750/26/background.png)
6. Sidewall Assembly
26
PNEG-1912 6', 7' and 9' Tall BFT Series and GHT Series
Continue to add rings with lighter gauges first, then heavier gauges. Each subsequent row of sidewall
sheets goes to the inside of the previous row of sidewall panels. Remember to place the caulking between
every ring.
for illustration of proper sidewall overlap and caulking detail.
Be sure to stagger all vertical seams between rows.
Figure 6D Ring Overlap Detail
Figure 6E
First ring assembly. Tighten
bolts from the nut side only.
Advertising