Roof cap and ground control – Grain Systems Tanks PNEG-1912 User Manual
Page 49
10. Roof Cap and Ground Control
PNEG-1912 6', 7' and 9' Tall BFT Series and GHT Series
49
1. With the lid closed, align the hole in the lever arm with the hole in the bin lid. Insert 1/2" bolt through
the hole and fasten with the nylock nut using 3/4" wrench and ratchet. NOTE: DO NOT over tighten.
This is a pivot bolt and the lever arm must be able to pivot freely.
Figure 10B Install Lever Arm and Chain
2. Place the lid assembly over the existing peak ring collar and rotate lid assembly such that the
lever arm and spring hinge line up with the roof eave bracket,
a clamp to pull the mounting brackets together. Slide the 3/8" carriage bolt supplied through the
mounting bracket and loosely fasten with nut,
. Remove clamp and tighten
the bolt with 9/16" ratchet, ensuring that the vertical flange tightens past the left edge of the top,
horizontal flange,
Figure 10C Mount Lid to Peak Ring
Mounting brackets
Clamp