10. Roof Cap and Ground Control
PNEG-1912 6', 7' and 9' Tall BFT Series and GHT Series
51
3. Thread the existing chain through the hole on the end of the lever arm and fasten it to the provided
key ring.
Ensure that the ground control chain is freely looped
through the roof eave bracket and chain holder. After removing the slack in the chain while the lid
is fully closed and in latched position, re-position the key ring 2" below the roof eave bracket.
Re-adjust the existing handle and key ring so the handle is positioned for easy
access from ground.
Check to make sure that the key rings allow the cap to fully
close, but will not allow the chain enough slack on top of the cap to become wrapped around the lever
arm in a high wind condition.