Ladder section assembly – Grain Systems Tanks PNEG-1912 User Manual
Page 39
Advertising
8. Optional BFT Ladder Assembly
PNEG-1912 6', 7' and 9' Tall BFT Series and GHT Series
39
Ladder Section Assembly
Two (2) splice plates are required to attach each additional ladder section. The head of the bolt should be
to the inside of the ladder with the splice plate on the outside as shown in
. Use 5/16" x 3/4" bolts
for all connections.
NOTE: With most installations, the last ladder section to reach the concrete will need to be cut to fit.
Figure 8L
Advertising