Figure 7-25 Assembling the short center collar channels to the long center collar channel
C
1/2 x 1-3/4 in. flange bolt (S-10252)
I
Long center collar channel (CTR-0278)
E
1/2 in. flange nut (S-10253)
J
Short center collar channel (CTR-0280)
G
1/2 x 1-3/4 in. flange bolt (S-10252)
K
Short channel clip (CTR-0329)
H
1/2 in. flange nut (S-10253)
17.Locate a short center collar channel (J), and install a short channel clip (K) to the outer edge of the
short center collar channel (J).
18.Install flange bolts (C) and flange nuts (E) to secure the short center collar channel (J) and the short
channel clip (K).
19.Locate the second center collar channel (J) and repeat this procedure.
20.Position the two short channel clips (K) to the right side of the long center collar channel (I) as
shown.
21.Install flange bolts (G) and flange nuts (H) to secure them with the long center collar channel (I).
Pneg-4135 135 Ft Diameter 40-Series Bin