Attaching the a-frame to the eave bracket, Chapter 7: roof assembly – Grain Systems Tanks PNEG-4135 User Manual

Page 125

Advertising
background image

Chapter 7: Roof Assembly

Figure 7-37 Exploded view of A-frame to center collar

A

A-frame rafter assembly

C

1/2 x 1-3/4 in. flange bolt (S-10252)

B

Center collar (CTR-0347)

D

1/2 in. flange nut (S-10253)

Attaching the A-Frame to the Eave Bracket

Assemble the lower portion of the A-frame rafters to the sidewalls.

1. Install flange bolts (B) and flange nuts (D), securing one side on the A-frame assembly.

2. Repeat this procedure for the other side of the A-frame.

3. Tighten to the recommended torque specifications. See

Bolt Torque Specifications, page 26

.

Pneg-4135 135 Ft Diameter 40-Series Bin

125

Advertising