Chapter 7: roof assembly – Grain Systems Tanks PNEG-4135 User Manual

Page 113

Advertising
background image

Chapter 7: Roof Assembly

Figure 7-27 Assembling the center cap plates

A

3/8 in. nut (S-456)

N

Tube caulk

I

Center collar channel assembly

O

Splice plate (CTR-0327)

L

Center cap plate (CTR-0281), approxi-
mately 262 lb (118.84 kg)

P

3/8 x 1 in. bolt with sealing washer (S-7487)

M

Center cap plate (CTR-0325), approxi-
mately 145 lb (65.77 kg)

25.Align the three side cap plates (Q, R and S) to the side of the center cap plates (L and M) on the

center collar assembly.

26.Apply a strip of tube caulk (N) along the row of holes on the three side cap plates as shown.

27.Install two splice plates (T and U) over the fresh strip of caulks (N), and install bolts (P) and nuts (A)

securing the side plates (Q, R and S) and the splice plates (T and U).

28.Repeat this procedure for installing the three side cap plates to the other side of the center cap

plates (L and M).

NOTE: Make sure the side cap plates (R and S) and splice plates (T and U) are aligned in respective

positions on both sides of the center cap plates as shown.

Pneg-4135 135 Ft Diameter 40-Series Bin

113

Advertising