Chapter 7: Roof Assembly

Figure 7-50 Cap plate assembly installed

G

3/8 x 1 in. bolt with sealing washer (S-
7487)

I

Holes for conveyor support brackets

H

3/8 in. nut (S-456)

Installing the Conveyor Support Brackets to the Peak Cap

Conveyor support brackets are attached to the peak cap and allow support for a conveyor or catwalk
system.

1. Place tube caulk around the bolt holes located in the cap plate where the conveyor support brackets

(B) will be installed.

2. Position a conveyor support brackets (B) against the cap plate and align the holes.

3. Install flange bolts (A) and secure with flange nuts (C).

4. Tighten to the recommended torque specification. See

Bolt Torque Specifications, page 26

.