Figure 7-45 Installing the first upper roof panel
C
Upper roof panel (CTR-0337)
E
5/16-18 x 1 flange bolt with sealing washer (S-
10260)
D
Middle roof panel (CTR-0343)
F
5/16 in. flange nut (S-3611)
15.With assistance, position the adjacent upper roof panels (C) overlapping the previous upper roof
panels.
16.Install flange bolts (E) and flange nuts (F) to secure the overlapping panels as shown.