Assembling the temperature cable bracket, Chapter 7: roof assembly – Grain Systems Tanks PNEG-4135 User Manual

Page 86

Advertising
background image

Chapter 7: Roof Assembly

Table 7-1 A-frame installation sequence and temperature cable locations for 135 ft diameter bin (cont'd.)

A-frame number

Rafter Number

Temp Cable Number

Radius Location

A21

R30

T14

32.2 ft

R31

A22

R9

T7

32.2 ft

R10

T2

12.3 ft

R11

T23

55.4 ft

NOTE: A-frames labeled “A1” through “A9” have X-bracing and are installed first. A-frames labeled “A10”

through “A22” are standard A-frames, and A-frames “A22” is a triple rafter assembly that will be the
final lift. The empty spaces that are not labeled must have purlins installed between the rafters
after all the A-frames are secured. The numbers reflect the recommended installation sequence of
the A-frame assemblies.

Table 7-2 Starting lengths for temperature cables for 135 ft diameter bins

Length from the center collar

None

Length from 12.3 ft diameter location

318.8 in. (809.75 cm)

Length from 32.2 ft diameter location

239.4 in. (608.08 cm)

Length from 55.4 ft diameter location

67.9 in. (172.47 cm)

The temperature cable lengths in the chart above are the distances from where the temperature cable
attaches to the rafter or the center collar to the top ring. To calculate the correct temperature cable length,
add 32 inches for each bin ring to the starting length. Temperature cables must terminate above any
unload equipment and be secured in place with twine. DO NOT allow cables to become tangled in unload
equipment.

Assembling the Temperature Cable Bracket

The temperature cable brackets are installed to the roof rafters and support the temperature cables.

Before You Begin

Determine the correct location of the temperature cable brackets within the structure of the A-frame
Assembly. See

About Temperature Cable Brackets and A-Frame Assemblies, page 83

.

What You Should Know

The A-frame assembly consists of two roof rafters, purlin clips, purlins and possibly X-bracing. The temper-
ature cable brackets should be installed when the A-frames are assembled.

NOTE: The temperature cable bracket must be installed at specific locations, see

About Temperature

Cable Brackets and A-Frame Assemblies, page 83

.

1. Attach a right purlin clip (C), a left purlin clip (D) and a temperature cable bracket (B) to the roof rafter

(A), and install three flange bolts (E) and three flange nuts (F).

NOTE: If no X-bracing is installed, install four flange bolts (E) and four flange nuts (F).

2. After all purlins and X-bracing are installed in the A-frame, tighten all hardware to the recommended

torque specifications. See

Bolt Torque Specifications, page 26

.

86

Pneg-4135 135 Ft Diameter 40-Series Bin

Advertising