Grain Systems Tanks PNEG-4135 User Manual
Page 122
Advertising
Guidelines for Assembling and Lifting the A-Frame Rafter Sections
The roof is assembled in sections and referred to as A-frame rafter sections. Each A-frame rafter section is
assembled on the ground and lifted into place.
NOTE: Use purlin clips as lifting points, as shown.
Figure 7-35 Recommended lifting points for A-frame sections
A
Purlin clip
122
Pneg-4135 135 Ft Diameter 40-Series Bin
Advertising