Assembly & installation – Grain Systems Custom, Utility and Bulk Tank Augers PNEG-1435 User Manual

Page 15

Advertising
background image

PNEG-1435 6", 8" & 10" Utility & Bulk Augers

15

4. ASSEMBLY & INSTALLATION

2. Slide the flight connecting shaft into the main section of flight and bolt together with Grade

8 Hex Bolt and Stover nut. Next slide extension flight onto connecting shaft and bolt
together using proper grade 8 bolts and stover nuts

(See Chart)

and

(Figure 4B)

.

Figure 4B

Flight Hardware

6"

3/8" x 2" - 16 Grade 8 Hex Bolts

8"

7/16" x 3" - 14 Grade 8 Hex Bolts

10"

1/2" x 3-1/2" - 13 Grade 8 Hex Bolts

Bolt

(See Chart)

Bolts

(See Chart)

Stover Nut

Flight Connecting Shaft

Extension Flight

Main Flight

Main Auger Tube

Advertising