Assembly & installation – Grain Systems Custom, Utility and Bulk Tank Augers PNEG-1435 User Manual
Page 17
Advertising
PNEG-1435 6", 8" & 10" Utility & Bulk Augers
17
4. ASSEMBLY & INSTALLATION
4. Slide the extension connecting band over the two sections of tube, making sure the
connecting band is centered over the mated surfaces of the tubes. Tighten the connecting
band down using the correct Hex Bolts and Nylock nuts
and
Figure 4D
Connecting Band Bolts
6"
5/16'' - 18 GR5 Nylock Nut
8"
5/16'' - 18 GR5 Nylock Nut
10"
3/8'' - 16 GR5 Nylock Nut
Extension Tube
Extension Connecting Band
Main Auger Tube
Nylock Nuts
Bolts
Advertising