4. Installation
18
PNEG-1421 Direct Gear Drive Bin Sweep Auger (with Roller Wells)
3. Place the connecting band onto the end of the unload tube closest to the center well.
(See Figure 4H.)
Figure 4H
4. Position the unload tube flush against the center well tube.
(See Figure 4I.)
Figure 4I