Perform pre-start checks operation, Perform pre-start checks, Operation – Grain Systems Unload Augers PNEG-1421 User Manual

Page 39

Advertising
background image

5. Operation

PNEG-1421 Direct Gear Drive Bin Sweep Auger (with Roller Wells)

39

Perform Pre-Start Checks

1. Make sure ALL belts are tensioned properly.

2. Make sure ALL shields are in place and that the belt(s) and pulley(s) are able to move freely.

3. Inspect the drive unit for any problems or potential problems.

4. Be aware of any emergency shut down procedures. Two (2) people must always be in a position

where the operation of the equipment can be monitored.

5. Before starting the auger for the first time, make sure that all parts are assembled correctly according

to the instructions in this manual.

Operation

A. Operation for 6" systems

1. Start the unloading auger. The motor is located on the power head outside the bin on the unload

tube. To figure out the horsepower needed for the equipment, use the horsepower chart

on Page 36

.

2. The safety snap pin should be inserted through the center well control rod and the control lever.

Make sure it has NOT been inserted through the intermediate well control rod.

(See Figure 5C

on Page 40.)

3. Place control lever in the second slot and pull lever to open gradually until the desired flow is

established.

(See Figure 5C on Page 40.)

It should not be necessary to open the gate more than

3" to 6".

4. Always close well gates and allow the unloader to clean out before stopping the unloader.

Do not open the gate more than 3"-6" as the flow of grain into the center well will be at a higher
rate than what the unload system can remove. This will cause the auger to plug or jam.

CAUTION

Failure to perform any or all of these pre-start checks may cause damage to the
equipment and/or cause SERIOUS INJURY or DEATH to those in the work area.
Failure to perform any or all of these pre-start checks may also be a misuse of the
equipment. Any misuse of the equipment may void the warranty.

DANGER

ALWAYS keep ALL guards and shields in place, until all the power is disconnected
and locked out.

WARNING

Make certain ONLY trained operators are in the work area before operating or
moving the machine. Two (2) people must always be in a position where the
operation of the equipment can be monitored.

CAUTION

DO NOT start/stop the auger while it is under load, this may cause the auger
to “jam”.

CAUTION

Failures may occur if the auger is run full before it has been “polished” during the
“break-in” period.

CAUTION

Be aware of any unusual vibration or noises during the initial start-up and
“break-in” period. If anything unusual is detected, immediately shut down the
auger and disconnect and lock out the power supply before servicing. Visually
inspect the auger periodically during operation.

Advertising