Control lever installation (6" systems) – Grain Systems Unload Augers PNEG-1421 User Manual

Page 23

Advertising
background image

4. Installation

PNEG-1421 Direct Gear Drive Bin Sweep Auger (with Roller Wells)

23

Control Lever Installation (6" Systems)

1. Close all slide control gates and keep them closed.

2. Attach the control lever by sliding the safety snap-on pin through the lever and both control rods.

Close the center well and intermediate well gates using the control lever and the various slots.

3. Place the safety snap-on pin through the center well control rod and the control lever as shown

in

Figure 4O

.

Figure 4O 6" Systems

Advertising