4. Installation
PNEG-1421 Direct Gear Drive Bin Sweep Auger (with Roller Wells)
21
3. With the flange not yet attached to the bin wall, make sure that the bin wall opening is large enough
for the clutch and well control rods to pass through the bin wall.
4. Slide the bin flanges flush up to the bin wall and tighten the bolts connecting the two (2) flanges.
5. Drill into the bin wall through the holes located on the four (4) corners of bin flanges. Fasten the
bin flanges to the bin wall using four (4) 5/16" x 3/4" bin wall bolts and serrated flange nuts.
Figure 4M
6. Drill the remaining holes into the bin wall and attach the remaining 5/16" x 3/4" bin wall bolts and
serrated flange nuts.