Grain Systems Unload Augers PNEG-1421 User Manual

Page 19

Advertising
background image

4. Installation

PNEG-1421 Direct Gear Drive Bin Sweep Auger (with Roller Wells)

19

5. Slide the connecting band until it is equally positioned over both the unload tube and the center well

tube. Position the connecting band so that it will not interfere with the control rods.

(See Figure 4J.)

Figure 4J

6. Secure the connecting band with three (3) 5/16" x 1-1/2" bolts and serrated flange nuts, making sure

the intermediate wells are aligned to the center wells.

Advertising