Installing the unload tube flight – Grain Systems Unload Augers PNEG-1421 User Manual

Page 28

Advertising
background image

4. Installation

28

PNEG-1421 Direct Gear Drive Bin Sweep Auger (with Roller Wells)

Installing the Unload Tube Flight

1. Begin by removing the tube end cap if you have not already done so.

2. Insert the flight into the tube with the square bushing end facing the center well and the round bushing

end facing the discharge end of the tube.

(See Figure 4W.)

Figure 4W

3. When the flight is approaching the center well shaft, it will be necessary to rotate flighting

counterclockwise in order to get it to seat properly on the squared clutch shaft. When the flight is
properly seated, the flight should be entirely inside the unload tube. It may be necessary to
pull the flight out, a small amount and attempt this step multiple times in order to seat the flight
properly.

(See Figure 4X.)

Figure 4X

4. On the initial stage, install with an empty bin, the installer might want to open the center well and enter

the bin to check and see that the flight is seated. Once they have seen that it has seated, they
will know the proper position of the flight on the discharge end when it has seated properly.

(See Figure 4X.)