YSI Vertical Profiler Systems User Manual
Page 39
Advertising
YSI Profiler System USER Manual
Figure 3-3 YSI Profiler Platform inside during Pre-Deployment Checkout
Figure 3-4 Winch Assembly mounted to T-frame; Winch motor to right of drum
The sonde cable from the controller connects to the drum on the left side in Figure 3-3 (not
visible in photo); while the winch motor/gear assembly is mounted to the right side. The orange
sonde cable routes through the opening in the deck. A diamond screw helps guide cable to wind
evenly on the drum. The cable passes through a V-roller suspension assembly that helps to
prevent possible snags or tangles as the sonde pays out or reels in during profiling.
YSI Environmental
669523 Rev B
Page 3-10
Advertising