Upload the graphical user interface, To the touchpanel – Extron Electronics TLP 710CV User Guide User Manual
Page 38
![background image](/manuals/312218/38/background.png)
5.
The project can be uploaded to one or more TouchLink touchpanels. To add a touchpanel:
a.
From the
Project
menu, select
Add > Panel
:
Figure 30.
Add a TouchLink touchpanel
The Panel Manager dialog box opens:
Figure 31.
Panel Manager Dialog Box
b.
Click the
Add Panel
icon (shown in the figure to the right) to add a new
touchpanel to the left pane.
c.
Highlight the name of the touchpanel in the left pane to display the
properties of that touchpanel in the right pane.
d.
When a new touchpanel is added, it is assigned the default IP address
(192.168.254.254). To change the IP address, highlight the address property in the
right pane and type in the correct IP address. Update any other properties, as required.
e.
Repeat steps 5b - 5d to add further touchpanels, if required.
6.
To upload a project to a TouchLink touchpanel:
a.
From the
Project
menu, select
Upload to Selected Panels
. The Build Manager
dialog box opens, showing the build progress. After the build is complete, this
dialog box closes and the File Upload Manager screen opens. The upload begins
automatically.
b.
Select
Close this dialog when upload completes
check box in the Automatic
Settings section so that the File Upload Manager screen closes automatically when the
upload completes. This option can be set before or during the upload.
TLP 710CV • Configuration Software
32