Installation – Hach-Lange Sigma SD900 Portable User Manual

Page 20

Advertising
background image

18

Installation

•

Make sure that the temperature at the site is within the
operating temperature range that is specified for the sampler.

•

Make sure that the intake tube is as short as possible.

•

Maximize the vertical slope of the intake tube from the sampler
to the sample source so that the tube drains completely. This
prevents cross-contamination of samples and freezing the tube.

Note: See

Specifications on page 5

for limitations on transport velocity

and maximum vertical lift.

Note: If site conditions do not permit the intake tube to have a
downward slope, or if the line is pressurized, disable the liquid sensor
and calibrate the sample volume (

section 4.8.2 on page 46

).

•

Install the strainer in the middle of the sample stream (not near
the surface or bottom) to make sure that a representative
sample is collected.

Figure 6 Mounting configuration

1

Strainer

4

Vertical lift

2

Intake tubing

5

Mounting surface

3

Suspension harness

Advertising