4 operator mounting positions, Front position with concrete pad, Front position with post mount kit – Controlled Products Systems Group 9000-080 User Manual

Page 14

Advertising
background image

9000-065-F-9-10

12

1.4 Operator Mounting Positions

Front Position with Concrete Pad

Standard method of installation.

Front Position with Post Mount Kit

Raises operator and allows different chain heights.

Additional hardware required. Post mount kit (P/N 9000-015).

The Model 9000 operator is designed to be installed in the front, rear and center mounting positions shown on this page and
the next 2 pages. V-wheel V-rail ornamental gates are shown as examples but other gate types on the previous page can use the
same mounting setups. Once the mounting position has been selected, refer to pages 15 thru 18 for specific installation
instructions.

Top View

Idler Wheels and Chain Setup

Top View

Idler Wheels and Chain Setup

Set operator chain idler wheels in the

bottom

position.

Optional chain tray kit may be installed.

See page 18 for more information.

Operator’s chain idler wheels are factory set

in the top position.

See page 15 and the post mount instruction sheet included with the kit for more information about post installation.

A filler post or barrier may need to be installed between
the gate and wall area (See page 8 for more information).

A filler post or barrier may need to be installed between
the gate and wall area (See page 8 for more information).

Advertising
This manual is related to the following products: