1 ac power wire runs and terminal connection, 115 vac, This gate operator must be properly grounded – Controlled Products Systems Group 9000-080 User Manual

Page 21: Single/primary operator

Advertising
background image

9000-065-F-9-10

19

OFF

ON

AC Power

SECTION 2 - AC POWER TO OPERATOR(S)

Before attempting to connect any wiring to the operator, be sure that the circuit breaker in the electrical panel is in the OFF
position. Permanent wiring must be installed to the operator as required by local electrical codes. It is recommended that a
licensed electrical contractor perform this work.
Since building codes vary from city to city, we highly recommend that you check with your local building department prior
to installing any permanent wiring to be sure that all wiring to the operator (both high and low voltage) complies with local
code requirements.

THIS GATE OPERATOR MUST BE PROPERLY GROUNDED!!

2.1 AC Power Wire Runs and Terminal Connection

If power wiring is greater than the maximum distance shown, it is recommended that a service feeder be installed. When large
gauge wire is used, a separate junction box must be installed for the operator connection. The wire table is based on stranded
copper wire. Wire run calculations are based on an AC power source with a 3% voltage drop on the power line, plus an
additional 10% reduction in distance to allow for other losses in the system.

This table illustrates the high voltage wire size and distance requirements.

Reduce the wire distance in half for primary/secondary dual gate application.

Wire Size / Distance in Feet

Amps

12 AWG

170

685

2875

100

380

10 AWG

275

1100

4600

170

650

8 AWG

460

1830

7665

280

1100

6 AWG

685

2750

11,500

520

1600

1/2 HP: 115 VAC Single Phase

1/2 HP: 208/230 VAC Single Phase

1/2 HP: 460 VAC Single Phase

1 HP: 115 VAC Single Phase

1 HP: 208/230 VAC Single Phase

Never

run low voltage rated wire insulation in the

same conduit as high voltage rated wire insulation.

5.4

2.7

1.35

9.7

4.9

For 208/230/460 Volt 1-phase
input, use only two legs of the
incoming 3-phase power.

Chassis

Ground

Hot

Neu

115 VAC

AC Power Terminal

208/230/460 VAC

AC Power Terminal

White - Neutral
Black - 115 VAC Hot
Green - Chassis Ground

Chassis

Ground

Hot

L1

L2

Hot

Route incoming AC power wire through the high voltage

conduit and run wire to the operator electronic box.

Be sure wiring is installed in accordance with local codes.

Be sure to color code all wiring.

It is recommended that a surge suppressor be installed on

the high voltage power lines to help protect the operator and
circuit board from surges and power fluctuations.

Secondary operator in a dual operator application gets power

through the 8-wire interconnection cable that links the
operators together. See 2.2 Primary/Secondary (dual) gate
wiring on the next page.

PU

SH

TO

O

PE

RA

TE

tec

hn

ici

an

us

e o

nly

Power

High Voltage
Conduit

AC Power
Terminal

High Voltage
Input Wire

High Voltage

Input Wire

High Voltage

Input Wire

DANGER

HIGH VOLTAGE!

PU

SH

TO OPE

RA

TE

technici

an u

se

on

ly

See page 33 for info about power
switch and cycling the operator.

DO NOT

power up and cycle the operator until

the “DIP-Switches” and the “Limit Switches”
have been adjusted. Damage could occur to the
gate and operator.

See pages 22, 23 and 24.

Single/Primary

Operator

CAUTION

Do not connect AC
power wire to terminal
until verifying operator
actually is 208, 230 or
460 VAC.

Advertising
This manual is related to the following products: