Description/Instructions

Locating the Boiler
a
) The boiler should be located in dry

surroundings on a level base, making

sure that there is sufficient room

around the boiler to enable the opera-

tor and/or the maintenance engineer

to gain access to all parts of the boiler.

Check location for ease of water sup-

ply and electrical connections.
b) Place the boiler on a non combus-

tible floor with clearances to unpro-

tected combustible materials, includ-

ing plaster or combustible supports.
c) It is necessary to have the follow-

ing vertical clearance from the floor to

the ceiling for removal of the burner

for servicing:

Minimum Vertical Clearances

BHP

IN

MM

6

82

2083

9.5

86

2184

10

86

2184

15

92

2337

20 92 2438

30

106

2692

40

104

2642

50

114

2896

60 124 3150

The Gas Supply
a)
Gas Piping should be installed in

accordance with National Fuel Gas

Code, ANSI-Z223-1-1984 or latest

addenda and any other local codes

which may apply. In Canada gas

installations must be in accordance

with the current CAN/CGA B149.1

and .2 and/or local codes.
b) Install a dirt trap ahead of all of the

gas valves.
c) The pipe and the fittings used

must be new and free of dirt or other

deposits.
d) The piping must be of the proper

size to ensure adequate gas supply to

the gas head assembly. Consult your

gas company for specific recommen-

dations.
e) For natural gas a pressure of 7" to

11" (178mm to 279mm) of water col-

umn pressure at the gas train is

required with burner firing. Do not

exceed 13" of water column.
f) For propane or butane gas the

pressure required is 11" (279 mm) of

water column pressure. Again, do not

exceed 13" of water column.
g) When making gas piping joints,

use a sealing compound resistant to

the action of liquefied petroleum

gases. Do not use teflon tape on

gas line threads.
h) The main and the pilot gas pres-

sure regulators must be vented to the

atmosphere.
i) After gas piping is completed care-

fully check all piping connections, (fac-

tory and field), for gas leaks. Use a

soap and water solution.

CAUTION

Some soaps used for leak testing

are corrosive to certain types of

metals. Rinse all piping thoroughly

with clean water after leak check

has been completed.
j)
The boiler must be disconnected at

the boiler shut off valve from the gas

supply piping system during any pres-

sure testing of the system at pressure

in excess of 1/2 PSIG--14" W.C.
k) The boiler must be isolated from

the gas supply piping system by clos-

ing the shut-off cock during any pres-

sure testing of the gas supply piping

system at pressures equal to or less

than 1/2 PSIG--14" W.C.

31-G 1/01