Description/instructions – Fulton Edge ICX or FB-F Vertical Tubeless Boilers (Steam), Gas Fired User Manual

Page 43

Advertising
background image

36-G 1/01

Water Gauge & Gauge Glass

Installation instructions

NOTE

Only properly trained personnel

should install and maintain water

gauge glass and connections.

Wear safety glasses during

installation. Before installing,

make sure all parts are free of

chips and debris.

NOTE

Keep gauge glass in original pack-

aging until ready to install.
1)
Verify the proper gauge has been

supplied.
2) Examine the gauge glass and

packings carefully for damage before

installation. Do not use the glass if it

contains any scratches, chips, or any

other visible signs of damage.
3) Do not subject the gauge glass to

bending or torsional stresses.
4) Apply teflon tape or pipe dope to

pipe threads. Install top gauge fitting

(fitting without a drain valve) into the

uppermost tapping. Wrench tighten

the fitting until it is snug and the glass

outlet is pointing at five o’clock (about

1/8 turn from its final downward verti-

cal position).
5) Install the bottom gauge fitting

(the fitting with a drain valve) until it is

snug and the glass outlet is pointing

directly upward. Verify top and bot-

tom fittings are threaded into the tap-

pings the same number of turns (dis-

tance A=distance B).
6) Remove glass packing nut, friction

washer and glass packing from the

fittings, and place them, in the same

order, on to both ends of the gauge

glass. Push both packings about an

inch up the gauge glass.
7) Gently insert one end of the

glass into the top gauge fitting.

Keeping the glass inside the top fit-

ting, gently rotate the top gauge fit-

ting clockwise until vertically aligned

with the bottom gauge fitting, then

inset glass into bottom fitting until

glass bottoms out on the shoulder

inside the bottom fitting.
8) Carefully raise glass about 1/16”

and slide lower glass packing down

until the glass packing contacts the

lower gauge fitting.

DO NOT allow

the glass to remain in contact with

any metal!

9) Carefully slide upper glass pack-

ing up as far as possible.
10) Hand tighten both glass packing

nuts, then tighten 1/2 turn more by

wrench. Tighten only enough to pre-

vent leakage.

DO NOT OVER

TIGHTEN! If any leakage should

occur, tighten slightly, a quarter turn

at a time, checking for leakage after

each turn.
11) Install the protective guard, and

utilize automatic ball checks where

necessary to help prevent injury in

case of glass breakage.

WARNING

Improper installation or mainte-

nance of gauge glass and connec-

tions can cause immediate or

delayed breakage resulting in bod-

ily injury and/or property damage.

Gauge Glass

Top Gauge

Fitting

Guard Rod

Glass Packing Nut

Friction Washer

Glass Packing

Bottom Gauge

Fitting

Vessel

Wall

Drain

Valve

B

A

Description/Instructions

Advertising
This manual is related to the following products: