Connecting the co, Sampling lines – ZOLL Propaq MD Rev A User Manual

Page 126

Advertising
background image

C

HAPTER

10 M

ONITORING

CO2

10-4

www.zoll.com

9650-0805-01 Rev. A

Connecting the CO

2

Sampling Lines

To connect the FilterLine or Smart CapnoLine:

1. Slide open the Propaq MD unit’s CO

2

inlet port cover.

2.

Put the fitting at the end of the sidestream tubing over the CO

2

inlet port connector.

3.

Turn the fitting clockwise to tighten.

Figure 10-1 Connecting the Sampling Line Connector to the CO

2

Inlet Port

Advertising