Yokogawa GC1000 Mark II Process Gas Chromatograph User Manual

Page 22

Advertising
background image

<1. Overview of Maintenance Terminal>

1-3

IM 11B03G03-03E

The windows are interrelated as follows:

Analyzer Operation

window

Chromatogram

window

Alarm Details window

Lab Analysis Results

window

Retention Time History

window

Concentration Analysis

History window

Latest Analysis

Results window

Alarm History window

Alarm Status window

Alarm-related windows

Analysis Results window

F0102.ai

n

Notes on Use

Note the following when using the LCD emulator and the Maintenance Terminal:

l

Use this software with the analyzer in the Remote mode.

Unless the analyzer is in the Remote mode, you cannot start the LCD emulator. The display

function of the Maintenance Terminal can be used even in the Local mode. But if it is operated, a

message appears informing the user that operation is not accepted.

l

The LCD emulator and Maintenance Terminal cannot be started at the same

time.

Therefore, if you want to use the Maintenance Terminal while the LCD emulator is still running,

first quit the LCD emulator and then start the Maintenance Terminal.

n

Notes before turning on the power switch

Please confirm all communication cables have been connected before turning on the power

switch.
Please turn on power switch in order of the GC1000 MarkII, the communication converter

(K9404LA), and personal computer. Please turn off the power switch by the opposite procedure.

n

Notes concerning communication cables

Please do not take off or install the communication cables during the power supply turned on.
If it will be done, it may be needed to turn on the main power again because of communication

error when the GCMT is used next time.

4th Edition : Mar. 21, 2012-00

Advertising