Analyzer operation window, Analyzer operation window -1, Lprior to operation – Yokogawa GC1000 Mark II Process Gas Chromatograph User Manual

Page 30

Advertising
background image

<3. Analyzer Operation Window>

3-1

IM 11B03G03-03E

3. Analyzer Operation Window

The Analyzer Operation window opens when the Maintenance Terminal is started. This

chapter explains how to open and close this window, how the window is composed, how

to change the operation status, and how to upload and download parameter settings.

*1: Appears as an icon

Windows™ Hierarchy

Program Manager

Maintenance

Terminal group

window

Startup

Initial Database

Loading window

Analyzer

Operation window

Chromatogram

window

[Alarm Status] or

[Alarm History]

command

[Close] command

Alarm window

[Chromatogram] menu

[Exit] command

Analysis Results

window *1

Termination

F0301.ai

l

Prior to Operation

Before starting up the Maintenance Terminal, always make sure that the:

• Maintenance Terminal has been installed properly in your personal computer.
• analyzer has been connected to your personal computer properly via a communication

cable.

4th Edition : Mar. 21, 2012-00

Advertising