Yokogawa Data Acquisition with PID Control CX2000 User Manual

Page 20

Advertising
background image

20

IM 04L31A01-02E

Setting PID Parameters on the Secondary Loop of Cascade Control

Select 2

Select Reverse

Select 1

Set to P=120.0% I=20 s,
D=0 s
(No need to change the
settings if the initial PID
values are set for
Press+Flow)

Control Setup Example 3: Loop Control with PV Switching

Object of Control and Description

Control valve

Switching valve

Steam

1

2

3

4

5

6

7

8

9

10

26

27

28

29

30

21

22

23

24

25

16

17

18

19

20

11

12

13

14

15

DISP

/ENTER

Distributor

+

ALM

PV1

PV2

PV switching
contact input

4 to 20mADC
current output

LOOP1 PV1

1

LOOP1 PV2

1

LOOP1 mA

2

1

Loop 1 PV input terminal
of the control input terminal block

2

Loop 1 current output terminal
of the control input terminal block

3

Relay contact output terminal
of the control output terminal block

DIGITAL IN

3

• Loop number:

1

• PID constant:

P = 120%, I = 20 s, D = 0 s

• Control direction:

Reverse

• Input type:

1-5 V for both measurement input 1 and 2

• Measurement span:

PV input 1: 0 to 300 kg/h, PV input 2: 0 to 30 kg/h

• PV range conversion:

Lower limit: 0 kg/h, Upper limit: 300 kg/h

• Flow rate setpoint:

100 kg/h

• Input switching condition: Contact input

Basic Control Settings

1.

Show the show the basic control setting menu.
See “Control Setup Example 1” for the steps to show the menu.

Examples of Control Setup Operation

Advertising