Psu series user manual – GW Instek PSU-Series User Manual User Manual
Page 78

PSU Series User Manual
78
5. On the master unit, set F-16 (Auto
Calibration Parallel Control) to 2 to
turn on the parallel calibration.
Calibration will begin immediately.
6. Whilst calibration is being performed, WAIT
will be displayed on the master screen.
Calibration will take a few moments.
VOLTAGE
CURRENT
VSR
LAN
RMT
ERR
DLY
ALM
ISR
M 1
M 2
M 3
RUN
C V
C C
V
A
7. When the calibration has finished, OK will be
displayed on the master screen.
VOLTAGE
CURRENT
VSR
LAN
RMT
ERR
DLY
ALM
ISR
M 1
M 2
M 3
RUN
C V
C C
V
A
8. Remove the shorts from the terminals, and
proceed with parallel operation.
Note
When performing parallel calibration, make sure
the terminals are connected with cables or bus bars
that are able to withstand the combined current
capacity of all the units in parallel.