Series operation, Ge 83, Operation – GW Instek PSU-Series User Manual User Manual
Page 83

OPERATION
83
Note
Ensure load cables have sufficient
current capacity.
Series Operation
Series
Configuration
Before using the power supplies in series, the
master and slave units need to be configured.
1. Configure the OVP, OCP and ULV
settings for each unit.
2. For each unit, hold the Function key while
turning the power on to enter the power on
configuration settings.
Lock/Local
PROT
Function
Test
Set
Output
Unlock
ALM_CLR
M 1
M 2
M 3
Shift
: Long Push
VSR
LAN
RMT
ERR
DLY
ALM
ISR
M 1
M 2
M 3
RUN
C C
A
C V
V
VOLTAGE
CURRENT
PSU 40-38
DC Power Supply
0 - 40V / 0 - 38A
Voltage
Current
3. Make sure each unit is set to
Independent (F-93 = 0). When
using the power supplies in series,
each unit is operated individually,
and thus no unit is considered the
master or slave.
Unit
F-93
Independent
0
4. Cycle the power on the units (reset the power).
Note
Configuration settings can be checked for both the
master and slave units by pressing the Function
key.