Normal start up sequence – UEi Test Instruments KM9106/P User Manual

Page 7

Advertising
background image

KM9106 Operators Manual

7

4. NORMAL START UP SEQUENCE

4.1 Every Time You Use The Analyser

BEFORE SWITCH-ON CHECK THAT:

the Oxygen sensor is connected


the particle filter is not dirty


the sulphur filter is fitted for heavy oil or coal


the water trap and probe line are empty of water


all hose connections, etc, are properly made


the paper roll is fitted


the probe is sampling ambient FRESH air


the water trap is vertical


the flue temperature is connected


the instrument is placed on a clean, flat, level surface


Switch ON the instrument by pressing

4.2 Automatic Calibration

During this sequence the analyser pumps fresh air into the sensors to allow toxic
sensors to be set to zero and the Oxygen sensor to be set to 20.9 %.

After switch-on the analyser will
briefly display the Kane logo and
telephone numbers:-

777

KANE-MAY 777

TEL +44 (0) 1707 375550

FAX +44 (0) 1707 393277

Followed by the logger menu screen :-

9

9 SELECT FUNCTION 9 9

. . LOGGER CONTROL

2 . . QUINTOX CONTROL

Use the and keys to
position the cursor over 2 . .Quintox
Control.


Press to access Quintox
Control

9

9 SELECT FUNCTION 9 9

1 . . LOGGER CONTROL
. . QUINTOX CONTROL

1

ON

2

ENTER

Advertising