Business continuity manager and ibm pprc, Business continuity, Related topics – HP XP Racks User Manual

Page 23

Advertising
background image

The following are examples of when you can perform a CG pair-split based on status of the BC Z
pairs in the CG:

Example 1

The are six BC Z pairs in a CG. Two of the pairs are paired (“DUPLEX” status), two are in
“PENDING” status, and two are in “Split/SUSPOP” status. In this case, you can perform a
CG pair-split, and doing so changes the status of all of the pairs in the CG to “Split/SUSPOP”.

Example 2

There are two BC Z pairs in a CG and one is paired (“DUPLEX” status) and the other is in the
process of being resynchronized (“Resync/PENDING” status). In this case, you cannot perform
a CG pair-split.

Example 3

The are six BC Z pairs in a CG. Two of the pairs are paired (“DUPLEX” status), two are in the
process of Quick Split (“V-Split/SUSPVS” status), and two are in “Suspend/SUSPER” status.
In this case, the CG pair-split ends abnormally and the status of all of the pairs in the CG
remains the same.

Using ATTIME Suspend to split CG pairs at a specific time

With ATTIME Suspend, you can define a specific time to simultaneously split all the pairs in a
consistency group and copy data from the P-VOLs to the S-VOLs.

The following image illustrates the use of ATTIME Suspend.

Business Continuity Manager and IBM PPRC preparation

You can use BCM or IBM PPRC to perform the BC Z pair tasks. IBM PPRC and BCM are independent
functions; you must use one or the other.

Related topics

For more information about:

The system requirements for BCM and IBM PPRC, see

“Business Copy Z system requirements”

(page 11)

.

BCM, see the Business Continuity Manager User Guide.

Business Continuity Manager and IBM PPRC preparation

23

Advertising
This manual is related to the following products: