Disaster recovery considerations, Error reporting communications (erc) – HP XP P9500 Storage User Manual

Page 30

Advertising
background image

When you create more pairs than the maximum initial copy setting, the pairs with priorities within
the maximum number specified run concurrently, while the pairs with priorities higher than the
maximum number wait. When one pair completes, a waiting pair begins, and so on.

If you perform a pair operation for multiple pairs (for a specific kind of data, for example), and
then perform another operation for multiple pairs (for another specific kind of data, for example),
the pairs in the first operation are completed in the order of their assigned priorities. The system
begins processing pairs in the second set when the number of pairs left in the first set drops below
the maximum number of initial copy-setting. This is shown in the following example.

See

“Specifying number of concurrent initial/resync copies” (page 63)

to set the maximum initial

copies.

The Priority field is discussed in

“Creating the initial copy ” (page 68)

.

Disaster recovery considerations

You begin a disaster recovery solution when planning the Cnt Ac-J Z system. The following are the
main tasks for preparing for disaster recovery:

Identify the data volumes that you want to back up for disaster recovery.

Pair the identified volumes using Cnt Ac-J Z.

Establish file and database recovery procedures.

Install and configure host failover software error reporting communications (ERC) between the
primary and secondary sites.

For more information on host failover error reporting, see the following topic. Also, review

“Disaster

recovery operations ” (page 104)

to become familiar with disaster recovery processes.

Error reporting communications (ERC)

Error reporting communications (ERC) transfers information between host processors at the primary
and secondary sites. It is a critical component of any disaster recovery effort. You can configure
ERC using channel-to-channel communications, NetView technology, or other interconnect

30

Planning volumes, P9500 systems

Advertising