Chapter 3 Preparing for Universal Replicator z/OS Operations

3-41

Hitachi Universal Replicator for IBM /OS User’s Guide

For detailed information about the hardware configuration required for 3DC
multi-target configuration, see the next section. For detailed information about

the requirements to create a URz pair for delta resync operation, see section
Requirements for Creating URz Pair for Delta Resync Operation. As for the
requirements to perform delta resync operation, see section Requirements for

Performing Delta Resync Operation.

If a failure occurs in a TCz Synchronous primary volume, which is also used as
a URz primary data volume, you can resume business tasks by using the TCz

Synchronous secondary volume. After you resume business tasks, you need to
remove the failure from the primary volume and transfer business tasks back
to the primary site. For details, see sections Recovering from Failures in the
Primary Site and the TCz Synchronous Secondary Site through Transferring

Business Tasks from the URz Secondary Site to the Primary Site

.

If a failure occurs in both the primary volume and the TCz Synchronous
secondary volume, you can resume your business tasks by using the URz

secondary data volume. After you resume business tasks, you need to remove
the failure from the primary volume and the TCz Synchronous secondary
volume, and transfer business tasks back to the primary site.

Hardware Configuration

A computer system in 3DC multi-target configuration requires the following

three sites:

Primary site for both TCz Synchronous and URz

Secondary site for TCz Synchronous

Secondary site for URz

Each of these sites requires one USP V storage system and Storage Navigator
computers. It is recommended that Business Continuity Manager should be
installed in host computers in each of these sites.

The following explains hardware configuration for USP V storage systems in
these sites.

USP V storage system in the primary site:

The USP V storage system must have TCz Synchronous installed.

The USP V storage system must have URz installed.

The USP V storage system must have a volume used as a TCz

Synchronous primary volume and a URz primary data volume.

The USP V storage system must have a URz master journal volume

If you use Business Continuity Manager, you need to make settings on
the storage system. Please refer to the Business Continuity Manager

User's Guide for information about settings required for volume
operations in remote sites.