HP StorageWorks XP Remote Web Console Software User Manual

Page 283

Advertising
background image

Chapter 10 Usage Scenarios

10-11

Hitachi Universal Replicator for IBM /OS User’s Guide

M-VOL/Prm.

data VOL

Master

JNLVOL

Primary site

URz

Sec. data VOL

R-VOL

JNLVOL

TCz
Synchronous

TCz Synchronous

secondary site

R-VOL/Prm.

data VOL

Master

JNLVOL

M-VOL

JNLVOL

M-VOL

JNLVOL

Restore

JNLVOL

R-VOL/Prm.
data VOL

Master

JNLVOL

業務

Tasks

業務

Tasks

業務

Tasks

Black arrow indicates copy direction.
If an arrow is solid (not dotted),
the pair is in Duplex status.

TCz
Synchronous

TCz
Synchronous

TCz Synchronous

secondary site

TCz Synchronous

secondary site

URz

URz

Primary site

Primary site

URz

secondary site

URz

secondary site

URz

secondary site

Sec. data VOL

Sec. data VOL

Restore

JNLVOL

Restore

JNLVOL

M-VOL: main volume
R-VOL: remote volume
Prm data VOL: primary data volume
Sec. data VOL: secondary data volume
JNLVOL: journal volume

Figure 10-2

Recovering from Failures in the Primary Site

Recovering from Failures in the Primary Site (When Delta Resync Operation is

Performed)

If a disaster or failure occurs only in the primary site in 3DC multi-target

system, you can use secondary volume in the TCz Synchronous secondary site
to enable the secondary site to take over your business tasks. After

transferring your business tasks to the secondary site, you need to remove the
failure from the primary site, so that you will be able to transfer your business
tasks back to the primary site.

To transfer your business tasks to the TCz Synchronous secondary site, follow
the procedure below. Business Continuity Manager is used in this procedure:
1. Use Business Continuity Manager to execute the YKSUSPND REVERSE

command on the TCz Synchronous pair.
TCz Synchronous pair will be split and the copy operation stops temporarily.

2. Use the TCz Synchronous remote volume to resume your business tasks.

Advertising
This manual is related to the following products: