HP XP P9500 Storage User Manual

Page 97

Advertising
background image

5.

Run the pairresync -swaps in the primary site on the other multi-target pair.

6.

Resume business operations at the primary site.

Figure 13 Configuration when transferring business tasks from the Cnt Ac-J secondary site to the
primary site (delta resync operation is performed)

Recovery for 3 Cnt Ac-J/Cnt Ac-S data centers and 3 Cnt Ac-J data centers

All procedures described in the following sections apply to both 3 Cnt Ac-J/Cnt Ac-S data centers
and 3 Cnt Ac-J data center recovery.

Recovery procedures when Cnt Ac-J P-VOLs and S-VOLs are shared with Continuous Access
Synchronous can be more complex than general procedures.

The following topics provide recovery procedures for resuming host operations at a backup site
and then restoring the original system and configurations.

“Recovery for 3 Cnt Ac-J/Cnt Ac-S DC cascade configuration ” (page 97)

“Recovery for 3 Cnt Ac-J/Cnt Ac-S DC multi-target configuration ” (page 98)

“Recovery in a delta resync configuration” (page 99)

“Recovery in a 2DC configuration ” (page 101)

Use RAID Manager to perform all procedures.

Recovery for 3 Cnt Ac-J/Cnt Ac-S DC cascade configuration

Host operations are transferred to the Cnt Ac-S secondary volume (S-VOL) at the intermediate site
when a disaster or failure occurs in the primary site of a 3DC cascade configuration. The primary
site failure is corrected and brought back online, then either the cascade configuration is restored
or the multi-target configuration is created.

See

“3DC cascade configuration ” (page 141)

or

“3 Cnt Ac-J DC cascade configuration” (page 126)

for information and illustrations on the configuration covered in this procedure.

Recovery for 3 Cnt Ac-J/Cnt Ac-S data centers and 3 Cnt Ac-J data centers

97