HP XP Racks User Manual

Page 201

Advertising
background image

6

.

Execute the following command:

# diag

Note

For details on the operations after executing the diag command, see

the AIX documentation. Steps 7 to 14 below provide an example of

the execution procedure for AIX V6.1 (Technology Level 02).

7

.

From the displayed menu, choose Task Selection.
The Task Selection List window appears.

8

.

Choose Hot Plug Task.
The Hot Plug Task window appears.

9

.

Choose PCI Hot Plug Manager.
The PCI Hot Plug Manager window appears.

10

.

Select List PCI Hot Plug Slots to check the PCI slot to be replaced:

The shading indicates the PCI slot where the HBA is to be replaced.

11

.

Go back to the PCI Hot Plug Manager window, select Unconfigure a

Device, and enter in Device name the device that is to be replaced.
For the Unconfigure any Child Devices and KEEP definition in

database items, select yes.

12

.

Go back to the PCI Hot Plug Manager window, select Replace/Remove a

PCI Hot Plug Adapter.
Select the HBA to be replaced.

13

.

Select Replace in the input field.

14

.

When the following message is displayed, replace the HBA:

HDLM Operation

4-25

Hitachi Dynamic Link Manager (for AIX) User Guide

Advertising
This manual is related to the following products: