Managing resource groups, Changing the name of a resource group, Deleting a resource group – HP XP P9500 Storage User Manual

Page 30: Using resource partition and other p9500 products

Advertising
background image

4.

In the Confirm window, confirm the settings, in Task Name type a unique name for this task
or accept the default, and then click Apply.

If Go to tasks window for status is checked, the Tasks window opens.

Managing Resource Groups

Changing the name of a resource group

When changing the name of a resource group, observe the following:

The name meta_resource cannot be changed.

Duplicate occurrences of the same name are not allowed.

The name of meta_resource cannot be set for a resource group name.

Resource group names can use alphanumeric characters, spaces, and the following symbols:
! # $ % & ' ( ) + - . = @ [ ] ^ _ ` { } ~

Alphabets are case-sensitive.

You must have Security Administrator (View & Modify) role to perform this task.

Procedure 4 To change a resource group name

1.

In the Remote Web Console main window, in the Storage Systems tree, click Administration,
and then Resource Groups.

2.

Click a resource group to change its name in the Resource Groups tab.

3.

Click Edit Resource Group.

4.

In the Edit Resource Group window, type a new resource group name, and then click Finish.

5.

In the Confirm window, confirm the settings, in Task Name type a unique name for this task
or accept the default, and then click Apply.

If Go to tasks window for status is checked, the Tasks window opens.

Deleting a resource group

You cannot delete the following:

The meta_resource.

A resource group that is assigned to a user group.

A resource group that has resources assigned to it.

Procedure 5 To delete a resource group

1.

In the Remote Web Console main window, in the Storage Systems tree, click Administration,
and then Resource Groups.

2.

Click one or more resource groups to delete in the Resource Groups tab.

3.

Click Delete Resource Groups.

4.

In the Confirm window, confirm the settings, in Task Name type a unique name for this task
or accept the default, and then click Apply.

If Go to tasks window for status is checked, the Tasks window opens.

Using Resource Partition and other P9500 products

To use Resource Partition with other P9500 products, the resources that are required for the
operation must satisfy specific conditions. The following topics provide information about the
specific resource conditions that are required for using each P9500 product.

“Snapshot” (page 31)

“Thin Provisioning” (page 32)

30

Configuring resource groups

Advertising