Maintenance – JKS OGS166 User Manual

Page 9

Advertising
background image

JKSOGS166

JKS Front Trackbar + Sector Shaft Reinforcement Installation

Page 9



Fuse the Frame Bracket (P) to chassis by plug

welding each side of the mounting flange.



Allow welded area to cool. Then apply black spray

paint to Frame Bracket and any bare metal to pro-

tect the surfaces from corrosion.



Move Chassis Connector Tube (O) back into posi-

tion and secure Rod End to Frame Bracket (P).

Tighten hardware until snug.



If necessary, twist Chassis Connector Tube (O)

until you reach neutral resistance.



Fully tighten both 5/8” Jam Nuts (S and T) against

Chassis Connector Tube (O).



Using a torque wrench, tighten the 1/2” x 2” Bolt

(U) on passenger-side to 60 ft-lbs. Tighten the

other 1/2” x 2” Bolt (U) that threads into the alumi-

num Steering Sector Pillow Block (E) to 35 ft-lbs.

‰

7. RE-INSTALL TRACK BAR



Apply anti-seize lubricant to bolt threads of original

track bar mounting hardware.



Re-install the track bar at the chassis bracket.

Insert the original bolt and nut and lightly snug the

hardware. Do not tighten original track bar hard-

ware until vehicle has been lowered and suspen-

sion is supporting full vehicle weight.



Lower vehicle to ground and tighten track bar bolt

to 125 ft-lbs.

Maintenance



Check torque specifications regularly.



Regular cleaning with pressurized water is recom-

mended to maximize reliability.

©2013 JKS Manufacturing, Inc & Aftermarketing, LLC

Revision Date 09/08/2014

Advertising