Goulds Pumps 3796 i-FRAME - IOM User Manual

Page 101

Advertising
background image

370B

496B

108

360D

c) Install the dowel pins (469B) and bolts (370B). Tighten the bolts in a criss-cross pattern according

to the specifications in the bolt torque values table.

d) Rotate the shaft 360º to check the adapter fit.

If the total indicator reading is greater than 0.005 in. (0.13 mm), then determine the cause and
correct it before you proceed.

7. Install the labyrinth oil-seal (333A) into the adapter (108) and the bearing frame (228).

The labyrinth oil seal is an O-ring fit.

8. Position the labyrinth oil-seal drain slots at the bottom (6 o’clock) position.

Refer to Assemble the INPRO labyrinth oil-seal for more information on the labyrinth oil-seal
installation.

Maintenance (Continued)

Model 3796 i-FRAME Installation, Operation, and Maintenance Manual

99

Advertising